Excess stormwater can cause flooding during rain events.
The pervious concrete captures at least 15,000 cubic feet (almost 6 Olympic size swimming pools) of stormwater within this project area during each rain event. More water is captured during long low-intensity rainfalls rather than during short high intensity events. Stormwater captured by the pervious concrete helps to reduce flooding issues.
Beneath the pervious concrete there is a 3-foot deep by 3-foot wide infiltration trench for effective capture of stormwater.
Captured stormwater is filtered and infiltrated for groundwater recharge.
Pervious concrete contains small spaces that allow water to pass through it. Capture and infiltration of stormwater instead of street flooding and discharge of untreated runoff into storm drain system, is the best management practice for reduction of stormwater pollution.
Infiltration trenches are long narrow trenches filled with coarse gravel for effective capture and infiltration of stormwater. During rain events, stormwater fills up the trenches quickly, filters through the gravel and seeps into the soils below. Plastic liner does not allow water under the existing street and sidewalk.
This project reduces stormwater pollution in Santa Clara River watershed, improves its beneficial uses such as providing recreational opportunity and natural habitat for endangered species, enhances groundwater recharge to maintain local water supply, and reduces localized flooding.
This project was financed under the Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Bond Act of 2006, administered by State of California, Department of Water Resources
We can reduce pollution in stormwater runoff by implementing these best practices:
More information about stormwater pollution prevention can be found at the following links:
Copyright © 2023 - Ventura County Watershed Protection